+94 112 401 305-7 galvanize@ltl.lk Mon–Fri 8:00–16:00 · Sat 8:00–12:00

One Partner.
Zero Gaps.

Stop juggling five vendors who all blame each other when something slips. Hand us the drawing — we'll hand you back a finished, coated, installed structure. One timeline. One team. One invoice.

Why Turnkey? Multiple Vendors vs Us How It Works Steel Fabrication Turnkey EPC
Six Reasons to Skip the Headache

Why Owners Choose Turnkey

Every one of these advantages is something our clients told us mattered more than the price on paper.

01

One Team, One Throat to Choke

When your fabricator, galvanizer, and installer are all different companies, delays mean a blame circle. With us, there’s one number to call and one team answering for every stage — no finger-pointing.

What it saves youEndless coordination calls and vendor-vs-vendor disputes.

02

Faster to Site

Sequential handoffs between separate vendors add weeks. Our design, fabrication, coating, and install teams work in parallel from day one — shaving real time off your critical path.

What it saves youWeeks of vendor handover delays on every project.

03

Lower Total Cost

The cheapest fabricator plus the cheapest galvanizer plus the cheapest installer almost never equals the lowest total cost. We remove the hidden costs — double-handling, rework, logistics, and management overhead.

What it saves youHidden costs that don’t show up in individual vendor quotes.

04

Built Right the First Time

Our in-house engineers design your structure knowing exactly how it will be galvanized and installed — no venting surprises, no clearance issues at the bath, no retrofit headaches. Fewer revisions, cleaner build.

What it saves youRework when a design wasn’t made with coating in mind.

05

Full Traceability

One QA system covers every batch — from raw steel testing to the final coating thickness report. You get a complete paper trail that your engineers, auditors, and insurers will actually trust.

What it saves youChasing documentation from multiple suppliers for audits.

06

One Contract. One Invoice.

Instead of managing five POs, five delivery schedules, and five sets of variation claims, you manage one. Your procurement team gets their time back. Your finance team stops chasing reconciliations.

What it saves youHours of procurement and accounts admin every week.
The Difference

Multiple Vendors vs. One Turnkey Partner

 

Juggling Five Vendors

  • Five quotes to chase, compare, and reconcile
  • Drawings re-interpreted at every vendor handover
  • Blame circles when one stage delays the next
  • Coating defects discovered after installation
  • Separate QC reports in incompatible formats
  • Logistics costs between each vendor’s yard
  • Your project manager juggling schedules full-time

One Partner — LTL Galvanizers

  • One quote, one contract, one clear scope
  • Drawings controlled end-to-end by our engineers
  • One team accountable from design to install
  • Coating specified in the design, not retrofitted
  • Unified QA documentation in one package
  • Under one roof — zero inter-vendor logistics
  • Your project manager runs the project, not a phone tree
How It Works

From Drawing to Finished Structure

Five stages, one team, one timeline. You approve each stage before we move to the next.

01

Design & Drawings

Our engineers translate your concept into fabrication-ready drawings — designed for easy coating and clean install.

02

Fabrication

CNC-precision cutting and welding to AWS D1.1 — so every piece fits and every joint holds.

03

Coating

Hot dip galvanizing, metallizing, or Duplex C5M — spec’d to your environment and lifespan goals.

04

Testing & QA

Independent lab load testing and coating verification — one QA package for your files.

05

Installation

Our team delivers and installs on your site — so your structure arrives ready to commission, not ready to erect.

One
Contract
One
Timeline
One
Invoice
One
QA Package
Zero
Vendor Gaps
What We Build for You

Steel Fabrication

Transmission towers, substation structures, communication masts, cable bridges, Bailey bridges, handrails, walkways, steel buildings — if it’s fabricated from structural steel, we can design it, cut it, weld it, and coat it.

Our plant is the only CNC-controlled fabrication facility of its type in Sri Lanka. You get precision, repeatability, and volume — so your schedule stays on track even when quantities are large.

What You Get

  • Designed for coating: Venting, drainage, and clearances planned from the drawing stage — no retrofit holes later

  • Welded to AWS D1.1: The US standard, independently verified — so structural integrity is documented

  • Fits first time: CNC precision means parts arrive on site ready to assemble — less field rework

  • Prototype-tested: Tower and bridge structures load-tested at an independent lab before mass fabrication

Discuss Your Project →
Full Project Delivery

Turnkey EPC

EPC means Engineering, Procurement, and Construction — and for us it means you don’t have to manage any of it. You tell us the outcome you want. We deliver it.
We’ve handled turnkey delivery for power plants, telecom networks, highway infrastructure, and industrial facilities. Whether it’s a single building or a multi-site rollout, one contract covers every stage.

Projects We Deliver

  • Power infrastructure: 33/132/220 kV transmission towers, substation structures, cable support systems

  • Telecom networks: Cellular and microwave tower rollouts across multiple sites

  • Highway infrastructure: Sign gantries, cable bridges, Bailey bridges, safety barriers

  • Industrial plants: Pipe racks, platforms, transformer tanks, steel buildings

  • Coastal & marine: Duplex-coated structures for environments where standard protection fails

Start a Project →
Free Consultation · No Obligation

Get Tell Us What You're Building

Send us a rough scope — we'll come back with a turnkey proposal, realistic timeline, and fixed pricing within 24 hours.

Get Your Quote → See Our Work
Planning a project? Talk to our engineers →